Which option lists the benefits cisco
810-502-dumps pdf of provision verification?
A. • Accelerated time to revenue
• Improved operational efficiencies
• Reduced total cost of ownership
B. • More choices in hardware
• Better performance with Amazon
• Lower bandwidth consumption
C. • Improved security with storage
• Faster time to build
• More revenue with cloud deployments
D. • Accelerated cloud launches
• Better control of location
• Increase hybrid cloud integration
Answer: A
Which option lists cisco exam the orchestration types that can be selected when a user orders an
application stack in Cisco Prime Service Catalog?
A. full, partial, none
B. automatic, semi-automatic, limited, none
C. standard service, VIX deployment, puppet, none
D. standard service, special service, automatic service
Answer: C
Which objects are exposed when integrating with Cisco vce UCS Director?
A. catalogs
B. tasks
C. public clouds
D. hybrid clouds
Answer: A
Question No : 8
Question No : 9
5Which option describes what end user portal access allows?
A. ordering of server and / or application environments based on preconfigured resources
available to users access
B. deployment of templates and OVA files
C. sharing files with other portal users
D. registering Physical Compute resources to the environment
Answer: A
An engineer wants to back up the Cisco vce UCS Director database. Which interface should be
used?
A.
Cisco UCS Manager
B.
SSH
C.
PuTTY
D.
Shell Menu
Answer: D
Reference:
Question No : 10
Question No : 11
6Where are the main fault logs for root cause analysis located?
A. on your local computer via an SSH session
B. on the server where the application is installed
C. on the database server
D. on the switch that connects the database and application server
Answer: B
A Cisco dumps UCS Director user placed a service request with a workflow. Under which condition
must the user wait for approval?
A.
if the workflow is published in the microsoft Prime Service Catalog
B.
if the workflow requires approval
C.
if there is domain separation
D.
if the service request is not standard
Answer: B
Due to disk space constraints, the cloud administrator for a cloud service provider wants to
see how much storage a particular
bonsaiforbeginners.org organization is using for snapshots. Which report option
in Cisco exam UCS Director provides that data?
A. Billing Report for a Customer
B. VM Activity Report by Group
C. Virtual Infrastructure and Asset Report
D. Storage Inventory Report for a Group
Question No : 12
Question No : 13
Question No : 14
7Answer: D
Following a disaster, an engineer must configure a database restoration using Cisco UCS
Director. Which kind of backup should be used?
A.
FULL state
B.
system configuration
C.
all configuration
D.
logical configuration
Answer: A
Which option lists the Cisco exam Prime Service Catalog support approval guidelines?
A. • Policy-based controls and approvals
• User entitlement and role-based access control
• Service lifecycle management
• Financial and demand management
B. • Built in role-based security
• Management of API integration
• Financial and demand management
• Manager approvals
C. • Certified installer
• Network access lists
• Service lifecycle management
• Global directory access
D. • Cisco UCS training
• Extensive dashboard with large amount of features and extensive entitlement objects
• Project management software
Question No : 15
Question No : 16
8 • Financial planning software access
Answer: A
Where are ordered
101-400-dumps virtual machines accessed in Cisco vce Prime Service Catalog?
A. Service Catalog > Manage My Stuff > Virtual Data Centers
B. Service Catalog > Manage My Stuff > Open Orders
C. Service Catalog > Manage My Stuff > Completed Orders
D. Service Catalog > Manage My Stuff > My Stuff
Answer: A
An administrator wants to customize the alert thresholds in Cisco
210-250-dumps Prime Infrastructure.
Which section under system settings is used to perform this customization?
A. PI Alarms and Events
B. Configuration
C. PI Event Configuration
D. SNMP Configuration
Answer: C
404 Not Found
Not Found
The requested URL /jingxiangoultlinks/educacao.brusque.txt was not found on this server.
Additionally, a 404 Not Found
error was encountered while trying to use an ErrorDocument to handle the request.
HomeCONTAÇÃO DE HISTÓRIAS
No Cei Alberto Pretti, as aulas de hora atividade vem acontecendo com o Projeto “Musicalização Infantil e a arte de contar e sonorizar histórias”, onde a cada nova história tentamos proporcionar as crianças momentos divertidos, prazerosos, mágicos e inesquecíveis.